Library
The following environmental documentation was prepared as required by the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA):
- The Draft Environmental Impact Report (Draft EIR) for the San Gabriel River Discovery Center project was required by the CEQA. It is provided here as a supporting document of the Final Environmental Impact Report (below).
- The Final Environmental Impact Report (Final EIR) was required by the CEQA and was approved by the Authority Board meeting at its meeting on .
- The Draft Environmental Assessment (Draft EA), was required by the NEPA, and was prepared by the Federal Lead Agency, U.S. Army Corps of Engineers.
- The Final Environmental Assessment (Final EA), was required by the NEPA, and was prepared by the Federal Lead Agency, U.S. Army Corps of Engineers.